Filed and executed in compliance with OSHA, DOB and the respective housing authority of the region the project is located in.
All workers hold a minimum 40 Hr SST with 4 hr scaffold user training, including 30 Hr OSHA. Supervisors hold a minimum 62 Hr Supervisor SST with field experience.
Cracked, spalled or water-damaged block is cut out and replaced, reinforced where needed and re-anchored to the structure.
The finished wall is pointed and sealed against water.